Tag Archives: GHM Rock Townsend

Happenings in Hackney – Horrible and Happy

1/ Gensler’s ski-centre (Snow In The City), to replace the media centre for the Olympic Park in Legacy Mode…..is it really legacy if your adding it afterwards? Other phrases that spring to mind are ‘zaha’ and ‘wannabe’……..HORRIBLE!


2/ GHM Rock Townsend have received planning permission for this building right opposite my proposed site in Hackney Wick…having previously been criticised for being ‘of poor design quality’ and ‘too tall’.

I would maintain that these criticisms are still valid of the revised scheme. The area – particularly the building shown to the left in this image – is rich in existing vitality (particularly of the light manufacturing type proposed by sportswear manufacturer Pentland, who are the client for this building), and it seems far too intrusive an insertion to be appropriate for its site.

Even last minute concessions to change metal cladding to ‘local vernacular’ brick do little to help the building settle in to its site. From our experience of researching this area, it seems that although there is a history of architectural resilience in the area, there is also a tradition of humble, user-initiated intervention. This feels far too brash and new to be where it is. What happened to the idea of re-instating the pub?

A BD Article can be found hereHORRIBLE!

 

Leave a comment

Filed under ARC552 - Studio, Uncategorized

GHM Rock Townsend Building – Hackney Wick

GHM Rock Townsend have received planning permission for this building right opposite my proposed site in Hackney Wick…having previously been criticised for being ‘of poor design quality’ and ‘too tall’.

I would maintain that these criticisms are still valid of the revised scheme. The area – particularly the building shown to the left in this image – is rich in existing vitality (particularly of the light manufacturing type proposed by sportswear manufacturer Pentland, who are the client for this building), and it seems far too intrusive an insertion to be appropriate for its site.

Even last minute concessions to change metal cladding to ‘local vernacular’ brick do little to help the building settle in to its site. From our experience of researching this area, it seems that although there is a history of architectural resilience in the area, there is also a tradition of humble, user-initiated intervention. This feels far too brash and new to be where it is. What happened to the idea of re-instating the pub?

A BD Article can be found here

Leave a comment

Filed under ARC552 - Studio